Elyntara International F.Z.E
Cloud & Hybrid Infrastructure
The question is not whether to use cloud. It is which workloads belong where, and why.
Principally
- Cloud and hybrid architecture
- Workload placement and dependency analysis
- Migration strategy and sequencing
Consider this engagement when
- A migration has stalled part-way and the workload now runs in two places.
- Cloud consumption is growing without a matching change in capability.
- Recovery objectives are documented but have never been demonstrated.
Why this work mattersClose
Hybrid is the steady state for most enterprises of any age, and it is harder to run well than either extreme. Placement decisions are driven by data gravity, latency, regulatory constraint, dependency chains and the real cost of operating a workload, not by a preferred platform.
We design against those constraints, sequence the migration in tranches that can be reversed, and make disaster recovery an architectural property rather than a document nobody has exercised.
Typical outputs
- Workload placement model with rationale
- Target infrastructure architecture
- Migration plan by tranche, with rollback positions
- Recovery objectives mapped to tested design
Capabilities
- Cloud and hybrid architecture
- Workload placement and dependency analysis
- Migration strategy and sequencing
- Cloud connectivity and interconnect
- Infrastructure optimisation and cost architecture
- Disaster recovery and business continuity design
- Multi-cloud considerations and exit planning
Start here
Have a complex technology challenge?
Whether you are evaluating a transformation, redesigning your architecture or working through a difficult technology decision, it starts with a conversation.